Additional Services — Tile, Flooring, Full Remodeling & ADU in Seattle, WA

From tile and flooring upgrades to full-home remodeling and ADU construction—planned clearly, built cleanly, and inspected where required.

Prefer to call? (360) 812-5445
Remodeled living space with new flooring and trim

What else we build

These services complement our bathroom and plumbing work. Tile and flooring now have dedicated planning pages; full remodeling and ADU scopes stay here until there is enough project-specific material for separate pages.

Tile & Backsplash

Shower walls, tub surrounds, accent walls, and backsplashes with proper substrates, membranes, and movement joints.

View service details

Flooring

Porcelain and ceramic tile or LVP with subfloor prep, moisture mitigation, and clean transitions.

View service details

Full Remodeling

Interior updates with layout changes, drywall, paint, lighting coordination, and code-compliant workmanship.

ADU Construction

Attached or detached ADUs covering planning, framing, bath/kitchenette tie-ins, ventilation, and inspections.

How we review each scope

Additional services can be small standalone upgrades or part of a larger remodel. We keep the scope specific so the estimate reflects the actual materials, access, prep work, and coordination needed.

Tile & backsplash

Tile work depends on what is behind the finish. We review the surface, wet-zone needs, layout, movement joints, and how edges meet tubs, showers, counters, trim, and adjacent flooring.

  • Shower walls and tub surrounds
  • Accent walls and kitchen backsplashes
  • Substrates, membranes, grout, and clean transitions

Flooring

Flooring installs start with the surface below. We look at flatness, moisture risk, transitions, trim details, and whether porcelain, ceramic tile, or LVP is the right fit for the room.

  • Subfloor prep and underlayment checks
  • Moisture mitigation where needed
  • Thresholds, base trim, and clean room-to-room transitions

Full remodeling

For larger interior updates, the work is planned around sequence and access. Layout changes, drywall, paint, lighting coordination, and plumbing tie-ins are organized before build work starts.

  • Scope planning and written estimates
  • Dust control and protected surfaces
  • Coordination with plumbing, lighting, and finish work

ADU construction

ADU scopes need careful planning because they can involve framing, bath or kitchenette tie-ins, ventilation, inspections, and city requirements. We define the scope first so the estimate matches the actual work.

  • Attached or detached ADU planning
  • Bath and kitchenette coordination
  • Ventilation, inspections, and code-aware sequencing

Materials & methods

Durability starts behind the finish. We match substrates, membranes, underlayments, and fasteners to your materials and follow manufacturer methods for lasting results.

  • Substrates & membranes matched to wet or dry zones
  • Expansion joints and movement accommodation
  • Underlayments and transitions optimized for flooring systems
  • Code-aware ventilation and egress for ADUs
  • Clean job sites with protected surfaces

How we deliver additional scopes

  1. 1

    Consultation & Scope

    Discuss goals, constraints, measurements, and timeline to align expectations.

  2. 2

    Options & Estimate

    Guidance on materials and finishes with a detailed, written quote.

  3. 3

    Permits & Scheduling

    Coordinate permits, inspections, and trade sequencing for efficiency.

  4. 4

    Build & Protect

    Floor protection, dust control, and tidy daily cleanup while work is underway.

  5. 5

    Final Walkthrough & Warranty

    Review results, confirm punch items, and deliver workmanship warranty details.

What affects the estimate

A clear estimate starts with the existing conditions. Two projects with similar finishes can price differently when surface prep, access, inspections, or trade coordination change the scope.

  • Existing surface condition, access, and demolition needs
  • Material choice, finish layout, grout, trim, and transition details
  • Whether plumbing, electrical, ventilation, or inspection coordination is required
  • Room size, protection needs, cleanup expectations, and project sequencing
  • Permit requirements for full remodels, structural changes, or ADU scopes

Additional services FAQs

Do you handle permits for full remodels or ADUs?

Yes. We advise on requirements, obtain permits when necessary, and coordinate inspections.

Which tile systems and grouts do you use?

We specify substrates, membranes, and grout systems suited to each area and finish, prioritizing longevity and maintenance.

Can you install flooring over existing tile?

It depends on flatness, transitions, and manufacturer guidance. We assess during consultation and outline prep steps.

How long does an ADU project take?

Timing varies with design, permits, inspections, and material availability. Your estimate includes a realistic schedule.

Do you coordinate electrical work?

Yes. We coordinate licensed electricians for circuits, lighting, ventilation, and code requirements.

Are you licensed and insured?

Yes—licensed, insured, and backed by workmanship warranty terms provided with your estimate.

Service area

Seattle, Everett, Bellevue, Kirkland, Redmond, Bothell, Lynnwood, Shoreline, and Edmonds. Call to confirm nearby cities.

Seattle, WA

Everett, WA

Bellevue, WA

Kirkland, WA

Redmond, WA

Bothell, WA

Lynnwood, WA

Shoreline, WA

Edmonds, WA

Call (360) 812-5445